NPRR099
| Title: |
RMR Incentive Factor Payment |
| Next Group: |
|
| Next Step: |
|
| Status: |
Approved on 04/15/2008 |
| Related Issue: |
|
| Related Project: |
|
| Date |
Gov Body |
Motion |
Result |
Against |
Abstentions |
| 04/04/2008 |
TAC
|
To recommend approval of NPRR099 as amended by TAC. |
Passed |
1 IOU |
1 IOU |
| 03/20/2008 |
PRS
|
To forward the Recommendation Report and IA to TAC. |
Passed |
0 |
0 |
| 02/21/2008 |
PRS
|
To recommend approval of this NPRR as submitted. |
Passed |
2 IOU, IPM |
1 Coop |
Vote tallies here reflect individual votes, not the weight of the votes by market segment. Affirmative votes are not recorded in these vote tallies. For additional details on the voting record, please consult the Recommendation or Action Report, or the official vote tally if available, as posted in the key documents.
| Status: |
Approved |
| Date Posted: |
01/09/2008 |
| Sponsor: |
Trip Doggett on behalf of Texas Nodal Transition Plan Task Force (TPTF) |
| Urgent: |
No |
| Sections: |
3.14.1.13, Incentive Factor. |
| Description: |
This Nodal Protocol Revision Request (NPRR) removes language that would allow the Incentive Factor payment in Reliability Must Run (RMR) Agreements to be reduced if, in ERCOT’s determination, the reduction in capacity materially affects reliability. |
| Reason: |
A flaw in the Texas Nodal Transition Plan Task Force (TPTF) voting spreadsheet resulted in the 9/28/06 TPTF vote on a motion to strike language in Section 13.14.1.13(2)(b), as proposed by NPRR024, Synchronization of PRRs 627 and 640, to be incorrectly reported as failing. On 1/03/08, TAC instructed TPTF to file a NPRR to strike the subsection as proposed in the 9/28/06 motion. |
-
(04/16/08, .doc, )
-
(04/04/08, .doc, )
-
(03/24/08, .doc, )
-
(03/14/08, .doc, )
-
(02/25/08, .doc, )
-
(01/16/08, .doc, )
-
(01/09/08, .doc, )