| Related Content |
| On ERCOT.com |
| EDS 2 Project Meeting Page |
| Key Contacts |
| EDS2@ercot.com |
| Primary MP Roles |
Nodal EDS 2: State Estimator and Real-Time Security Analysis
Objectives
- Verify telemetry performance
- Verify state estimator (SE) performance
- Verify network security analysis (NSA) functions
- Verify network operations model (NOM) and network operations model change request (NOMCR) process
- Restructure load model to improve bus load forecasting
- Develop/update procedures for nodal SE, network security analysis (NSA) and network model
